Question: Consider the network described in the table below. Activity Preceding Optimistic Probable Pessimistic A 5 11 14 B 3 3 19 C 6 10 14

Consider the network described in the table
Consider the network described in the table
Consider the network described in the table below. Activity Preceding Optimistic Probable Pessimistic A 5 11 14 B 3 3 19 C 6 10 14 D |A, B 3 5 7 E B 4 16 11 IF C 6 8 13 G DE 2 4 6 IH F 3 9 D AB 3 S 7 E B 4 6 11 6 8 13 G DE 2 4 6 H F 3 3 9 Calculate the slack at G 0 8 3 O 1 None of the other options are correct