Question: Create gant chart for the wbs and duration is for febuary 2023 to july 2023 Project Initiation 1.1 Define project objectives and requirements, 1.2 Conduct

Create gant chart for the wbs and duration is for febuary 2023 to july 2023

  1. Project Initiation 

 

1.1 Define project objectives and requirements,

1.2 Conduct a feasibility study, 

1.3 Secure necessary permits and approvals,

  1. Design and Planning 

 

 2.1 Hire an architect or designer,

 2.2 Develop architectural and structural drawings,

 2.3 Prepare detailed plans for electrical, plumbing, and HVAC systems, 

2.4 Obtain necessary design approvals,

  1. Site Preparation

 

3.1 Clear the construction site, 

3.2 Excavate and grade the land,

3.3 Install temporary fencing and signage,

  1. Foundation and Structure

 

4.1 Excavate and lay foundation footings,

4.2 Pour and cure concrete foundation,

4.3 Construct walls and load-bearing structures,

4.4 Install roof trusses or beams,

MEP

 

 5.1 Rough-in plumbing lines (water supply, drainage, etc.),

 5.2 Install plumbing fixtures (sinks, toilets, showers, etc.),

 5.3 Rough-in electrical wiring and outlets,

 5.4 Install electrical fixtures (lights, switches, outlets, etc.),

  1.  

 

6.1 Install ventilation, and air conditioning (HVAC) systems,     STOP HERE

6.2 Insulate walls, floors, and ceilings,

6.3 Install vapor barriers and insulation materials,

  1. FINISHINGS

 

7.1  complete wall finishes,

 7.2 Apply paint or wallpaper,

7.3 Install flooring materials (tiles, hardwood, carpet, etc.)

 7.4 Install doors, windows, and trim,

7.5 Install built-in cabinets and shelving,

  1. Fixtures and FITTING

 

 8.1 Install kitchen cabinets and countertops,

 8.2 Install bathroom fixtures (sink, toilet, shower, etc.) 

8.3 Install light fixtures and switches 8.4 Install appliances (stove, refrigerator, dishwasher, etc.)

  1. Final Touches 
    1. Conduct final walk-through with the owner,

 

9.1 Conduct final inspections 

9.2 Clean the construction site,

 

           9.4 Address any punch list items,

           9.5 Obtain a certificate of occupancy,

  1. Project Closeout 

 

10.1 Document as-built drawings and specifications,

10.2 Complete final paperwork and financials 

10.3 Hand over keys to the owner

10.4 Conduct post-construction evaluation and lessons learned.

Step by Step Solution

3.40 Rating (150 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Project Initiation Define project objectives and requirements Duration 2 weeks Conduct a feasibility study Duration 3 weeks Dependency 1 Secure necess... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!