Question: Determine (1) the critical path and (ii) project duration for the network given at the end of the assignment. Use the following estimates for Optimistic.

Determine (1) the critical path and (ii) project

Determine (1) the critical path and (ii) project duration for the network given at the end of the assignment. Use the following estimates for Optimistic. Most Probably, and Pessimistic times for each activity: Activity Immediate Optimistic Most Probable Pessimistic Predecessor A Start 5 6 7 B Start 5 12 13 A 6 8 10 D A 4 10 10 E 5 6 13 F BD 7 7 10 G (Finish) EF 4 7 10 E G 1 D Start