Question: Determine if protected left - turn phases should be provided for any of the approaches b ) Calculate the sum of the flow ratios for
Determine if protected leftturn phases should be provided for any of the approaches
b Calculate the sum of the flow ratios for the critical lane groups
c Calculate the minimum cycle length assuming capacity utilizationXc
d Calculate the optimal cycle length
e Calculate the effective green times for each phase for optimal cycle
f Calculate the displayed yellow and allred times for each phase
g Calculate the required pedestrian green times
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
