Question: Develop a 4 - level work breakdown structure ( WBS ) for the Medical Clinic that is assigned for the term project. The WBS must
Develop a level work breakdown structure WBS for the Medical Clinic that is assigned for the term project. The WBS must be professionally developed on an appropriate software and uploaded on Canvas in a picture or PDF file format.
In reference to the WBS developed in question above, but on a separate document or sheet, list different cost items in each of the following categories as it pertains to this project:
Direct costs at least items
General conditions at least items must be different
Indirect costs and reserves at least items