Question: Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete at
Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete at least 96 instruments per 24-hour day. The assembly-line activities are:
| TASK. | TIME (min). | PREDECESSORS. |
| A | 3 | |
| B | 6 | |
| C | 7 | A |
| D | 5 | A, B |
| E | 2 | B |
| F | 4 | C |
| G | 5 | F |
| H | 7 | D, E |
| I | 1 | H |
| J | 6 | E |
| K | 4 | G, I, J |
| Total | 50 |
1. If the daily (24-hour) production rate is 96 units, what is the highest allowable cycle time? [ Select ] ["12", "15", "16", "14"] minutes.
2. If a cycle time of 10 minutes could be achieved, what would the daily (24-hour) production rate be? [ Select ] ["150", "132", "120", "144"] units per day.
3. Based on 10-minute cycle time, what is the theoretical minimum number of stations with which the line can be balanced? [ Select ] ["6", "5", "7", "4"]
4. With a 10-minute cycle time and six workstations, what is the efficiency? [ Select ] ["81.81", "83.33", "85.00", "86.67"] %
5. What is the total idle time per cycle with a 10-minute cycle time and six workstations? [ Select ] ["8", "10", "11", "12"] minutes.