Question: Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete 96
Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete 96 instruments per 24-hour day. The assembly-line activities are:
Draw the precedence diagram.
If the daily (24-hour) production rate is 96 units, what is the highest allowable cycle time?
minutes.
A 12
B 14
C 15
D 16
If the cycle time after allowances is given as 10 minutes, what is the daily (24-hour) production rate?
units per day.
A 132
B 150
C 120
D 144
With a 10-minute cycle time, what is the theoretical minimum number of stations with which the line can be balanced?
A 7
B 5
C 6
D 4
With a 10-minute cycle time and six workstations, what is the efficiency?
A 85.00%
B 83.33%
C 81.81%
D 86.67%
What is the total idle time per cycle with a 10-minute cycle time and six workstations?
A 8 minutes
B 11 minutes
C 10 minutes
D 12 minutesg

Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock