Question: Draw a project network given the information below. Complete the forward and backward pass, compute activity slack, and identify the critical path. How long will

Draw a project network given the information

  1. Draw a project network given the information below.
  2. Complete the forward and backward pass, compute activity slack, and identify the critical path.
  3. How long will this project take? How sensitive is the network schedule?
  4. Calculate the free slack and total slack for all noncritical activities.
Use the information contained below to compress one time unit per move using the least cost method. Assume the total in direct cost for the project is $700 and there is a savings of $50 per time unit reduced. Record the total direct, indirect, and project costs for each duration. What is the optimum cost-time schedule for the project? What is the cost? Note: The correct normal project duration and total direct cost are provided. Crash Cost Maximum Normal Normal Time Cost Act. (Slope) Crash Time A 0 2 100 B 100 1 3 200 40 1 200 D 60 2 3 200 E 20 1 5 200 F 40 1 4 150 G 0 2 150 B 3 3 Project duration 14 A 2x E G 5 2x 5 F Total direct cost 1,200 4

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!