Question: Draw the precedence diagram iPhone Production Standards Element ID Work Element Decription Precedence A Fixture and Secure the rear case (base) --- B Install the

Draw the precedence diagram

iPhone Production Standards
Element ID Work Element Decription Precedence
A Fixture and Secure the rear case (base) ---
B Install the Lightning plug connector assembly into the rear case (base) A
C Affix (fasten) the lightning connector assembly; 4 screws B
D Install the Power Button A
E Install 3 side buttons (Mute switch and volume controlS) C,D
F Install the Power & Volume button flex cable assembly E
G Prepare the Wifi antenna assy E,F
H Install and fasten Blue tooth antenna PCBA assy G
J Secure/affix wifi and Bluetooth assemblies with metal bracket G,H
K install the taptic engine (vibrations & sensory motor) and secure the metal bracket F
L connect the side buttons to the power & volume flex cable F
M secure the button and cable assembly with 2 metal brackets and screws K,L,J
N Install the rear facing camera assembly (includes flex cable) ojy
O Install the front facing & infrared camera assembly (includes flex cable) ``
P Install upper speaker assembly M
Q Quality check! Ensure proper fastening & function of the side buttons, toggle, Power, Vibration) N,O,P
R Prepare the SIM card tray and ejection mechanism/assembly ---
S Install Logic board PCBA_1 Q
T install Logic Board PCBA_2 Q
U Connect the rear facing camera flex cable to PCBA_1 S
V Connect the front facing camera with infrared camera assembly and IR flex cable to PCBA_2 T
W Connect the power switch/volume flex cable to PCBA_1 S
X Secure all cable connections with fasteners U,V,W
Y LCD screen & digitizer assembly is prepared by removing protective foils and attaching LCD to the digitizer via 4 screws ---
Z Attach and Secure (with 2 screws) the home button assembly within the LCD screen frame (hole provided). ---
AA Install front facing camera's flex cable assembly V,Y,Z
BB Install microphone and bottom speaker assembly and secure with metal bracket + 3 screws AA
CC Battery & Charging coil assembly is prepared by applying double-sided adhesive strip to both the battery assembly and the charging coil assembly. ---
DD Install (adhere) the charging coil onto the battery pack CC
EE Adhere the battery/coil assembly into the case (base) by press/hold allowing the adhesive to settle. DD
FF Connect the LCD screen to the logic boards_PCBA_1/2 & secure with metal plates (2 plates) (6 screws) Z, BB, EE
GG Connect the home button flex cable to the logic board_PCBA FF
HH insert waterproofing gaskets GG
JJ Press/insert SIM card tray into side location of base/case HH,X
KK Snap-press together the base/case and LCD assembly to become an enclosed/finished assembly JJ, R
LL Secure the overall assembly with 2 screws in the lower end of the base/case assembly KK
MM Power up and test/inspect functionality of: screen touch activation, sounds, antennas, location services, swiping & setting of app preferences, battery health, cameras, utilities, and calling (send/receive), 360 Visual Check LL
OO Place phone into the fibreboard crate for transit to packaging depot (3rd party packager) MM

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Law Questions!