Lead Time completed, the operator moves the assembled boards to the final assembly area. This move takes minutes to complete. time between these two operations. Packaging and labeling requires minutes per unit.
Required: percentages to one decimal place. Categorize the nonvalueadded time into wait and move time.
Valueadded lead time min.
Nonvalueadded lead time:
Wait time lead time
Move time lead time min
Total nonvalueadded lead time
Total lead time
Valueadded ratio as a percent
Move time in this process could best be reduced by: