Question: Example 2.34 The utility data for a network is given in Table 2.111. Crash the network to minimum possible duration and find the associated cost.

 Example 2.34 The utility data for a network is given in

Example 2.34 The utility data for a network is given in Table 2.111. Crash the network to minimum possible duration and find the associated cost. The total normal cost of the project is ?9,00,000. T Table 2.111. Crash the network to minimum possible duration and find the

Step by Step Solution