Question: For each project work step below from 1-13 provide an evidence obtain, level of evidence reliability, and audit procedure. Provide an evidence obtained from 1-13
For each project work step below from 1-13 provide an evidence obtain, level of evidence reliability, and audit procedure.
- Provide an evidence obtained from 1-13 be specific in one sentence.
- Level of evidence reliabilty it could be High, Medium or Low chose one of these 3, and explain in one sentence why do you chose High Medium or Low.
- Chose one of these below from 1-8 for the Audit Procedure and explain in one sentence why do you chose one of them.
1. Inquiry
2. Observation
3. Inspection
4. Vouching
5. Tracing
6. Reperformance
7. Analytical procedures
8. Confirmation
| Project Work Step | Evidence Obtained | Level of Evidence Reliability | Audit Procedure |
|---|---|---|---|
| Information Request: Audit Preparation | |||
| Schedule a kick-off meeting with the benefits department contact person on the first day of the audit and obtain the following items at the start of the audit:
|
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts