1. On the part below, apply postion controls to allow the holes to move 0.4 side...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
1. On the part below, apply postion controls to allow the holes to move 0.4 side to side but only 0.1 in the up and down direction. Include references to datum features A, B, and C. B na Dintsieg Tolerancin 2. On the part below, show the size and shape of the tolerance zones that were defined on the previous drawing. -3X15*0.3 -0.1 B -3X015+0.3 گنجین y Coltrance for the 3 holes in relation to datum A7 3. What is the perpendicularity tolerance for the 3 holes in relation to datum A? Explain. 13.27 Workshop Exercise 13.1 4. On the rectangular hole in the part below, apply a profile of 0.1 all around in relation to datum A to control the size and shape. In addition, apply a position to the hole within a 0.5 boundary at MMC in relation to the datums A, B, C to control the location. 50+0.5 13.28 A MMB -80±0.5 40 MMB E & 5. On the part below, calculate the allowable min and max hole sizes as well as the size of the MMB position boundary created. Size Max Min erancing € Max. Min www Geo.lim To Size F Workshop Exercise 13.1 6. Below are two sets of position feature control frames, one of them is composite position the other is simply two position callouts. The upper entries of the two specifications are identical. However, there is a difference in the lower segments. In the space provided, explain the meanings of these two lower segments. Composite Position Frame Two Single Segments Geometric Diffe تجر -Upper segment controls location and orientation of features to specified datums. 0.6ABC 02 AB ing This segment controls location and orientation of features to specified datums. 0.6ABC 02MAB کنونش www.Geo-Dim-Tol.ir 1. On the part below, apply postion controls to allow the holes to move 0.4 side to side but only 0.1 in the up and down direction. Include references to datum features A, B, and C. B na Dintsieg Tolerancin 2. On the part below, show the size and shape of the tolerance zones that were defined on the previous drawing. -3X15*0.3 -0.1 B -3X015+0.3 گنجین y Coltrance for the 3 holes in relation to datum A7 3. What is the perpendicularity tolerance for the 3 holes in relation to datum A? Explain. 13.27 Workshop Exercise 13.1 4. On the rectangular hole in the part below, apply a profile of 0.1 all around in relation to datum A to control the size and shape. In addition, apply a position to the hole within a 0.5 boundary at MMC in relation to the datums A, B, C to control the location. 50+0.5 13.28 A MMB -80±0.5 40 MMB E & 5. On the part below, calculate the allowable min and max hole sizes as well as the size of the MMB position boundary created. Size Max Min erancing € Max. Min www Geo.lim To Size F Workshop Exercise 13.1 6. Below are two sets of position feature control frames, one of them is composite position the other is simply two position callouts. The upper entries of the two specifications are identical. However, there is a difference in the lower segments. In the space provided, explain the meanings of these two lower segments. Composite Position Frame Two Single Segments Geometric Diffe تجر -Upper segment controls location and orientation of features to specified datums. 0.6ABC 02 AB ing This segment controls location and orientation of features to specified datums. 0.6ABC 02MAB کنونش www.Geo-Dim-Tol.ir
Expert Answer:
Answer rating: 100% (QA)
1 2 Small Circle represent up and down 01 tolerance zone Big circle represent side to side 04 to... View the full answer
Related Book For
Posted Date:
Students also viewed these mechanical engineering questions
-
This exercise will provide practice on properly applying datum feature symbols. On the drawing above, apply datum feature symbols to create the following theoretical datums. If you need help, see...
-
1. On the part below, apply postion controls to allow the holes to move 0.4 side to side but only 0.1 in the up and down direction. Include references to datum features A, B, and c. - 3X15*0.3 P-0.1...
-
7. The three functional gages below can be used to verify the three segment position specification that is shown earlier in this unit. Calculate the pin sizes for these gages to help explain the...
-
Using the sinking fund Table 13.3, complete the following: Note: Do not round intermediate calculations. Required amount $ Frequency of Length of payment time 8 years 15,000 Annually Interest rate 8...
-
Suppose that X is a continuous random variable. Explain why P(X = x) = 0. Which of the following probabilities are the same? Explain. P(a < X < b), P(a X b). P(a < X a b), P(a X < b)
-
Using Figure 3.88 design a problem to help students better understand mesh analysis using matrices. 10 30 20 40 30 V3 . 12 +) .
-
Refer to the information in Exercise 16-12. Prepare a process cost summary using the FIFO method. (Round cost per equivalent unit calculations to two decimal places.) Data From Exercise 16-12 The...
-
The comparative balance sheet of Beets Industries, Inc. at December 31, 2013 and 2012, is as follows: An examination of the income statement and the accounting records revealed the following...
-
How Safe Are You? Assume one of your favorite activities is mountain climbing. When you go mountain climbing, you have several safety devices to keep you from falling. You notice that attached to one...
-
In this mini-case you will perform some procedures required as a part of audit planning. For ease your audit manager has already organized the workpapers and completed several of the required...
-
In the context of a corporate takeover, in a self-tender offer, the target corporation offers to Blank______. Multiple choice question. delegate corporate responsibilities to a third-party delegatee...
-
f(x)= 9/x x= 1, x= a What is the net change? What is the average rate of change?
-
solve 7 / 3 = 5 / x + 4 for x
-
find any horistonal asymptoptes of f ( x ) = 3 x - 9 / 2 x - 6
-
5. A box is dragged along the ground by a rope that applies a force of 14 lb at an angle of 30 with the ground. Find the work done by the force in pulling the box 20 ft.
-
profitability, liquidity, gearing, efficiency ratios. I am confused on the numbers to use, but also the values for pre-calculation before calculating the actual ratios. For example: calculating...
-
Find the slope of the secant between the values x = defined by the function: 1 and x = p(x) = x36x+10x +8. 2 on the curve
-
A woman at a point A on the shore of a circular lake with radius 2 mi wants to arrive at the point C diametrically opposite on the other side of the lake in the shortest possible A time. She can walk...
-
If A is a matrix such that Find A. A.-I-32-4 1/2-1
-
In Exercises 1-5, use properties of determinants to evaluate the given determinant by inspection. Explain your reasoning. 1. 2. 3. 4. 5. 122 102 120 300 051 003 422 335 211 314 101
-
(a) Show that the eigenvalues of the 2 Ã 2 matrix b'
-
_______ The quantity has the t distribution with (n - 1) degrees of freedom. (H) 2/n
-
_______ The t distribution is more dispersed than the normal.
-
If we decrease the confidence level, the width of the confidence interval will: (1) increase (2) remain unchanged (3) decrease (4) double (5) none of the above
Study smarter with the SolutionInn App