Question: Hide Assignment Information Turnitin Turnitin enabledThis assignment will be submitted to Turnitin . Instructions Assume that you are a time analyst and your job is
Hide Assignment Information
Turnitin
Turnitin enabledThis assignment will be submitted to Turnitin
Instructions
Assume that you are a time analyst and your job is to measure the amount of time it takes to do the following simple task:
A worker is sitting on a chair and there is a box of bolts, a box of washers, and a box of nuts on his desk. His job is to take a bolt with his right hand, hold it and take a washer with his left hand, insert the bolt into the washer and then take a nut with his left hand and screw the nut three rounds onto the bolt. How much time would you assign to this task using the MODAPTS technique. Make sure to write all the codes both letter and number for each elements of the task.
Save your answer in a pdf file and upload it here. This is a teamwork assignment and only one file per team is needed
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
