Question: How long will this project take? How sensitive is the network schedule? Calculate the free slack and total slack for all noncritical activities. ID Description

 How long will this project take? How sensitive is the network

How long will this project take? How sensitive is the network schedule? Calculate the free slack and total slack for all noncritical activities. ID Description Predecessor Time (days) A Systems design None 2 B Subsystem A design C Subsystem B design A D Subsystem C design E Program A B F Program B C NNI G Program C H Subsystem A test I Subsystem B test J Subsystem C test G K Integration H, I, J L Integration test K 10. Page 199K. Nelson, project manager of Print Software, Inc., wants you to prepare a project network; compute the early, late, and slack activity times; determine the planned project duration; and identify the critical path. His assistant has collected the following information for the color printer drivers software project: ID Description Predecessor Time A External specifications None 8 B Review design features A N C Document new features A 3 D Write software A 60 E Program and test B 40 F Edit and publish notes C 2 G Review manual D 2 H Alpha site E. F 20 I Print manual G 10 J Beta site H. I 10 K Manufacture 12 L Release and ship K 3 11. A large Southeast city is requesting federal funding for a park-and-ride project. One of the requirements in the request application is a network plan for the design phase of the project. Sophie Kim, the chief engineer, wants you to develop a project network plan to meet this requirement. She has gathered the activity time estimates and their dependencies shown here. Show your project network with the activity early, late, and slack times. Mark the critical path. ID Description Predecessor Time A Survey None B Soils report A 20 C Traffic design A 30 D Lot layout A 5 E Approve design B, C, D 80 F Illumination E 15 G Drainage E 30 H Landscape 25 Signage 15 10

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!