Question: Which activities are over allocated? (10 points) Use the Resource Graph view to identify the any resource overallocation. What is the maximum level of overallocation

Which activities are over allocated? (10 points)
Which activities are over allocated? (10 points)
Which activities are over allocated? (10 points) Use the Resource Graph view to identify the any resource overallocation. What is the maximum level of overallocation and on which days such overallocation of resources occur? Assume the project starts today (10 points). . Solve the overallocation using the time-constrained method. Could we solve the overallocation issues? What happened to the critical path? (10 points). Solve the overallocation using the resource-constrained method. How many days was the project delayed to find a solution? What happened to the critical path? (10 points). . Calculate the cost of the project (10 points): 12. You are creating a customer database for the Lehigh Valley IronPigs minor league baseball team. Draw a project network, given the following information. Complete the forward and backward pass, compute activity slack, and identify the critical path. How long will this project take? How sensitive is the network schedule? Calculate the free slack and total slack for all noncritical activities. ID Description Predecessor Time (days) A 2 Systems design None B Subsystem A design A C Subsystem B design A D Subsystem C design A Program A B Program B C Program C D Subsystem A test E Subsystem B test F Subsystem C test Integration Integration test EFGH J KL G H. I.J K 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!