Question: I keep getting 86.06% for the efficiency. That is wrong. Please show me how to get the correct efficiency. The following table details the tasks

I keep getting 86.06% for the efficiency. That is wrong. Please show me how to get the correct efficiency.

I keep getting 86.06% for the efficiency. That is

The following table details the tasks required for Indiana-based Frank Pianki Industries to manufacture a fully portable industrial vacuum cleaner. The times in the table are in minutes. Demand forecasts indicate a need to operate with a cycle time of 11 minutes. Performance Activity Activity Description Time (mins) Predecessors A Attach wheels to tub 4.0 B Attach motor to lid 1.8 Attach battery pack 2.8 B Attach safety cutoff 3.8 E Attach filters 3.0 B Attach lid to tub 2.0 A, E G Assemble 3.0 attachments H Function test 4.0 D, F, G 1 Final inspection 2.0 H J Packing 2.0 I Tom a-b) One of the possible assignment of tasks to workstations is shown correctly in Fig. 2 . The efficiency of the assembly line with 3 workstations = 86.06% (enter your response rounded to two decimal places)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!