Question: If the engineer worked for 20 hours on a job, Z, the overhead rates were 125 per cent of direct labour cost and the direct
If the engineer worked for 20 hours on a job, Z, the overhead rates were 125 per cent of direct labour cost and the direct labour rate was $25 per hour, what is the total cost of the job? show working
A. $500
B. $ 625
C. $1000
D. $1125