Question: In an MRP problem, A is an MPS item. Every A requires 2 B s and 3 C s . Every B requires 5 C

In an MRP problem, A is an MPS item. Every A requires 2 Bs and 3 Cs. Every B requires 5 Cs. All lead times are two periods. Initial inventory value for A is 100, B is 200, and C is 0. Use lot-4-lot method for order quantities for all items. If gross requirement for A is 800 in period 9, what will be the planned-order release for B in period 5?