Question: In an MRP problem, A is an MPS item. Every A requires 3 Bs and 2 Cs. Every B requires 5 Cs. All lead times

In an MRP problem, A is an MPS item. Every A requires 3 Bs and 2 Cs. Every B requires 5 Cs. All lead times are one period. Initial inventory values for all items are 0. Use lot-4-lot method f