Question: In setting up a kanban control system and you need to determine the number of kanban card sets needed. If the expected demand during lead
In setting up a kanban control system and you need to determine the number of kanban card sets needed. If the expected demand during lead time is 50 per hour the safety stock is 20% of the demand during the time, the container size is 8. If the leadtime to replenish and orders is 3 hours, what number of kanban card sets is needed? round to nearest integer