Question: In setting up a kanban control system, you need to determine the number of kanban card sets needed. If the expected demand during lead time
In setting up a kanban control system, you need to determine the number of kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 2 hours, what number of kanban card sets is needed?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
