Question: include slack for each activity too please 2. Consider the network described in the table below. Times are given in weeks (keep 2 decimal points).

include slack for each activity too please include slack for each activity too please 2.
2. Consider the network described in the table below. Times are given in weeks (keep 2 decimal points). Activity Immediate Pessimistic Most Likely Optimistic Predecessor(s) b m a A 15 10 8 B 9 8 7 A.B I 10 5 D B.C 3 3 3 E D 9 5 1 F CE 11 8 5 a. Draw the network diagram