Question: Jamison Construction has implemented a cost estimation system using regression analysis. The variable cost estimation system using regression analysis. The variable cost per hour of

Jamison Construction has implemented a cost estimation system using regression analysis. The variable cost estimation system using regression analysis. The variable cost per hour of labor is 34 and the fixed cost was determined to be 147,000. If Jamison projects was determined to be working 233,000 hours in 2019, what is the projected total cost