Question: kindly give me answer Question No. 5 Activity Dependency optimistic Most likely Pessimistic A 6 8 IB 4 5 IC | A 2 3 4

kindly give me answer
Question No. 5 Activity Dependency optimistic Most likely Pessimistic A 6 8 IB 4 5 IC | A 2 3 4 ID B x-1 x+2 x = (last digit of your roll no. +4) E B 3 4 F 18 10 15 IG EF 3 4 H C.D 2 2.5 1. By using three estimates for each activity, find: [2] 1.1. Estimated time 't." Activity standard deviation 's' 2. Draw PERT network after calculating the events' estimated times and standard deviations. [4] Question No. 5 Activity Dependency optimistic Most likely Pessimistic A 6 8 IB 4 5 IC | A 2 3 4 ID B x-1 x+2 x = (last digit of your roll no. +4) E B 3 4 F 18 10 15 IG EF 3 4 H C.D 2 2.5 1. By using three estimates for each activity, find: [2] 1.1. Estimated time 't." Activity standard deviation 's' 2. Draw PERT network after calculating the events' estimated times and standard deviations. [4]Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock