Question: Ne observations from a work measurement study using continuous ting are shown below. Alwines are determined : personal, five percent: figuright percent delay, tive percent

Ne observations from a work measurement study
Ne observations from a work measurement study
Ne observations from a work measurement study using continuous ting are shown below. Alwines are determined : personal, five percent: figuright percent delay, tive percent Use the WORK Measurement Excel template to determine the standard time for this operation Work Observation Element 2 7 8 9 Performance ating A 0.12 0.17 0.10 0.09 0.14 0.12 0.18 0.17 0.18 105 0.23 0.20 0.22 0.22 0.25 0.24 0.26 0.27 0.22 35 C. 0.460.480.46 0.45 049 049 048 046 0.50 954 D 0.4 0.69 0.64 0.02 0.72 0.61 0.68 0.69 0.72 0.73 0.27 0.75 0.700.79 0.33 0.79 0.7 0.02 100% F 1.03 1.02 1.00 1.00 1.08 12 102 1.00 1.10 1101 Round your answer to two decimal places minutes Allowances 5 Rating 1.00 Standard Time 0.66 Work element Get housing and stom 1 2 1.10 Sew in stem 8 9 10 11 12 3 1.00 Get and insert washer 4 1.00 Get and insert screw 5 027 Tightens Normal Observation 1 2 3 4 5 6 7 8 9 10 Sum Average Time Cumulative time 0.03 003 0.02 0.03 0.06 0.03 0.00 0.00 0.03 0.03 Element time 0.03 0.03 0.02 0.03 0.04 003 0.04 0.00 0.03 0.03 0.12 00 0.012 Cumulative time 0.13 0.15 0.14 0.16 0.13 0.12 0.14 0.16 0.15 0.15 Element time 0.100.12 0.12 0.13 0.09 0.09 0.10 0.12 0.12 0.10 1.09 0.11 0.120 Cumulative time 0.24 0.25 0.20 0.29 0.23 0.21 0.24 0.26 0.27 0.22 Element time 0.11 0.10 0.12 0.13 0.10 0.00 0.10 0.10 0.12 0.09 106 0.11 0.106 Cumulative time 012 033 0,36 0.38 0.3 0.30 032 033 0.3 0.1 Element time 0.0 0.0 0.0 0.09 0.10 0.00 0.08 0.07 0.10 0.09 0.88 0.09 OOR Cumulative time 0.48 0.50 0.54 0.53 0.50 0.450.51 052 0.58 0.49 Element time 0.16 0.17 0.18 0.15 0.17 0.15 0.19 0.19 0.21 0.18 175 0.18 0.170 Cumulative time 051 0.53 058 056 054 0.49 054 0.55 0.62 0.52 Element time 0.00 0.00 0.00 0.03 0.04 OM 0.03 0.03 0.04 0.03 0.34 0.03 DOM Cumulative time Element time Cumulative time Element time Cumulative time Element time Cumulative time Element time Som 0550 6 1.00 14 15 16 1/ 18 19 20 Place assembly in tray 7 8 9 10 32 23 20 25 26 22

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!