Question: need help ASAP Expected Time 3- + Calculate the expected time for the following activities. (2.5 points) Activity Optimistic Time Realistic Time Pessimistic Time A

need help ASAP need help ASAP Expected Time 3- + Calculate the
Expected Time 3- + Calculate the expected time for the following activities. (2.5 points) Activity Optimistic Time Realistic Time Pessimistic Time A 3 8 13 B 4 10 12 1 2 11 D 4 6 8 E 1 3 9 I 4- Complete the following table (illustrative of a network diagram). (14 points) Activity Expected Time Predecessors TE TL Slack Critical Path? (Yes/No) A 2 00 20 C 8 B D A N AD E F G E 3 4 D, E