Question: need help finding buffer size, throughput rate, total time, and wgat is the total production time for 1 0 0 pieces In this assignment, we
need help finding buffer size, throughput rate, total time, and wgat is the total production time for pieces
In this assignment, we will practice the following essential metrics in the production design to
Understand balancine a produ
We nould determine the buffer sixe, throughput rate, and total cost as follows:
Buffer size:
To balanee the production line
Show image transcript
There are steps to solve this one.
Expertverified
Share
st step
All steps
Answer only
Step
Based on the information provided, the buffer size is the throughput rate is piecesminute the total production time for the batch size of pieces is hours, and the total cost of the line operating two shifts with one operator per section would be calculated as follows:
Explanation:
Manufacturing cost: pieces centspiece $
Labor cost: shifts dollarshour hours dollars
Fixed cost: shifts dollarsday days dollars
Overhead cost: dollars
Total cost: dollars.
Step
Based on the information provided, the buffer size between work centers and would be:
Buffer size
Explanation:
The throughput rate would be:
Throughput rate
piecesminute
Step
The total production time for the batch size of pieces would be:
Total production time
minutes
hours approx hours and minutes
Explanation:
The total cost of the line operating two shifts with one operator per section would be:
Materials cost cents pieces dollars
Labor cost dollarshour hours dollars
Fixed cost dollars shifts dollars
Overhead dollars dollars dollars dollars
Answer
Total cost dollars dollars dollars dollars dollars
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock