Question: P4. Based on the Table below, a) Construct the AON network diagram, perform the forward and backward pass analysis on the diagram and identify the

 P4. Based on the Table below, a) Construct the AON network

P4. Based on the Table below, a) Construct the AON network diagram, perform the forward and backward pass analysis on the diagram and identify the critical path. b) What is the minimum time needed to get the project done? c) Which activity/activities has/have different total slack and free slack