Question: please answer and explain thanks A production system at a manufacturing company is given in the flowchart below. The boring operation occurs separately from, and



please answer and explain thanks
A production system at a manufacturing company is given in the flowchart below. The boring operation occurs separately from, and simultaneously with, the cutting and milling operations. A product needs to go through only one of the four assembly operations. The four assembly operations are in parallel. Assembly 0.8 units/hour Cutting Milling Assembly 5 units/hour 4 units/hour 0.8 units/hour Welding 2.5 units/hour Assembly Boring 3 units/hour 0.8 units/hour Assembly 0.8 units/hour Question 10 (3 points) Which operation is the bottleneck? Assembly 4 Milling Cutting Welding Boring 9 Question 11 (3 points) 12 The bottleneck time = A) minutes per unit. Use 2-decimal accuracy for the final answer, e.g., 0.12, when necessary. Question 12 (3 points) For the entire production system, the throughput time = A minutes. Use 2-decimal accuracy for 1 Question 12 (3 points) For the entire production system, the throughput time = A minutes. Use 2-decimal accuracy for the final answer, e.g., 0.12, when necessary. Question 13 (3 points) If the company operates 2 shifts per day, 8 hours per shift, and 20 days per month, the capacity of this production system = A/ units per month. Use 2-decimal accuracy for the final answer, e.g., 0.12, when necessaryStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
