Question: Please help with CPM schedule. I need Total Float, Free Float, and Shared Float. Thanks. B C D E F G H 1 K L

Please help with CPM schedule. I need TotalPlease help with CPM schedule. I need Total Float, Free Float, and Shared Float. Thanks.

B C D E F G H 1 K L M N Q R S T U v w 1 KEY 2 7 3 3 Security Fence Landscape 4 ES DUR EF 5 ACTIVITY 6 7 LS TF LF IF a SF FF 9 3 10 10 Spread Sand Build Playground 11 12 13 14 15 16 0 1 4 5 6 2 17 Mobilize Layout Work Demo Shed Pave Parking Lot DeMobilize 18 19 20 21 22 23 6 5 24 Bring in Fill Finish Grade 25 27 29 30 7 31 Cut Trees 32 33 34