Question: Prepare a master production schedule based on the following information: Beginning inventory: 1 4 5 , schedule production whenever projected - on - hand drops
Prepare a master production schedule based on the following information:
Beginning inventory: schedule production whenever projectedonhand drops below and production lot size is units.
tableWeek