Question: Prepare a master production schedule based on the following information: Beginning inventory: 145 Schedule production whenever projected-on-hand drops below 20 . The production lot size

Prepare a master production schedule based on the following information: Beginning inventory: 145 Schedule production whenever projected-on-hand drops below 20 . The production lot size is 250 units. What is the difference between the Available to Promise Inventory and the Projected On Hand Inventory) for Period 7