Question: Prepare a master production schedule based on the following information: Beginning inventory: 150 Schedule production whenever projected-on-hand drops below 20. The production lot size is

 Prepare a master production schedule based on the following information: Beginning

Prepare a master production schedule based on the following information: Beginning inventory: 150 Schedule production whenever projected-on-hand drops below 20. The production lot size is 250 units. What is the difference between the Available to Promise Inventory and the Projected On Hand Inventory) for Period 7? Your