Question: Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.] Craft Pro Machining produces machine

Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3

[The following information applies to the questions displayed below.] Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records.

Production Activity Indirect Labor Indirect Materials Other Overhead
Grinding $ 400,000
Polishing $ 110,000
Product modification 500,000
Providing power $ 215,000
System calibration 460,000

Additional information on the drivers for its production activities follows.

Grinding 14,000 machine hours
Polishing 14,000 machine hours
Product modification 1,600 engineering hours
Providing power 18,000 direct labor hours
System calibration 950 batches

Job 3175 Job 4286
Number of units 180 units 2,250 units
Machine hours 500 MH 5,000 MH
Engineering hours 28 eng. hours 28 eng. hours
Batches 30 batches 90 batches
Direct labor hours 440 DLH 3,960 DLH

Problem 17-3A Part 5

5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.)

Overhead costs 0 per direct labor hour
Direct labor hours
Product DL hours Plantwide OH rate Total Overhead Cost Units Produced OH Cost per unit
Job 3175 440 $0.00 $0 180
Job 4286 3,960 $0.00 $0 2,250

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!