Question: Problem 2 Create the project network diagram. Calculate the early, late, and slack times for each activity. Identify the critical path. ID Duration Predecessor(s) A

Problem 2 Create the project network diagram. Calculate the early, late, and slack times for each activity. Identify the critical path. ID Duration Predecessor(s) A 2 4 A 6 A mong 8 A 18 B C-fs + 10 TI 2 D C-ff + 7 G 5 F E-ff + 9 H 5 G-ss + 10 14 E 15 G H I-ff + 5