Question: Problem 6-1 (Static) An assembly line with 17 task is to be balanced. The longest task is 24 minutes, and the total time for all

Problem 6-1 (Static) An assembly line with 17
Problem 6-1 (Static) An assembly line with 17 task is to be balanced. The longest task is 24 minutes, and the total time for all tasks 18 minutes. The line wil operate for 450 minutes per day a. What are the minimum and maximum cyde timer? (Round your answers to 1 decimal place) Minimum cycle time Maximum cycle time minutes minutes t. What range of daily output is theoretically possible for the fine? (Round your answers to 1 decimal place. Enter the smaller value in the first box and the larger value in the second box) Katon unday c. What is the minimum number of workstations needed if the maximum output rate is to be sought? (Round up your answer to the next whole number d. What cycle time we provide an output of 25 units per day found your answer to ideal place) e. What output powerede 95

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!