Q-12: An isolated three-phase signal is being designed for optimum cycle length of 90s. the total lost time
from all the three phases is 15s. The critical flow ratios for phase I and II are 0.2 and 0.3 respectively.
Determine the critical flow ratio for phase III as per Webster's method of traffic signal design. Given
that saturation flow for volume in phase III is 500 pcu.