Question: Q.2 (25 points) Cost and schedule data for a small project are given below. Develop the time-cost curve (Project Crashing for the project and determine

Q.2 (25 points) Cost and schedule data for a
Q.2 (25 points) Cost and schedule data for a small project are given below. Develop the time-cost curve (Project Crashing for the project and determine the minimum project duration and the minimum crashing cost. Duration days) Activity Preceded by Cost (LE) Crash Normal Crash Normal A 6 3 7 18 9 7 5 9 19 10 B B D E F G H 1 3900 6500 7200 4900 2200 1700 7200 10000 4700 3600 5500 6350 4700 2050 1200 7200 9450 4500 B C F E D. G. H 6 5 10 6 8 $ 11 7