Question: Question 1 (a) For the Table of Element, e, element time, te, and predecessor elements, p and Suppose over the planning horizon, the daily shift
Question 1 (a) For the Table of Element, e, element time, te, and predecessor elements, p and Suppose over the planning horizon, the daily shift schedule calls for N = 105 units of the four models G = 1, 2, 3). The typical mix of the shift schedule among the three models is: Nu = 50, N2 = 30 and N3 = 25. The Management feels it will be desirable to adopt mixed model make-to order assembly line with three features fand four options k as given in the table for the frequency of option, na below no fik 0 2 3 4 1 2 20 0 50 80 30 40 40 10 20 10 R fk If RA bh 1 h 1 2 3.0 3.1 4 5.0 5.1 5.2 53 5.4 6 7 8 9.0 9.1 92 10 1 1 1 2 2 2 2 2 1 1 4 1 1 1 1 Prepare the inventory requirement for each part over the shift schedule when N=105 for (1) When same part for all options of feature f (11) When different part for each option of feature f (b) (b) Suppose the inventory requirement for the above line is 105 for which the Rt = Rht=105 for t =1-7. On hand inventory =300; on-order inventory = 0 and the multiple quantity from supplier M for the parts are given as show below; determine the inventory replenishment worksheet for day 1 for the 10 parts 8 90 9.1 92 10 4 1 1 1 1 Prepare the inventory requirement for each part over the shift schedule when N-105 for (1) When same part for all options of feature (m) When different part for each option of feature (b) (b) Suppose the inventory requirement for the above line is 105 for which the RtRht=105 fort-1-7; On-hand inventory =300, on-order inventory = 0 and the multiple quantity from supplier . M for the parts are given as show below, determine the inventory replenishment worksheet for day 1 for the 10 parts 1 12 14 M 12 30 100 20 24 1 0 40 6 30 6 7 8 9 10 Question 1 (a) For the Table of Element, e, element time, te, and predecessor elements, p and Suppose over the planning horizon, the daily shift schedule calls for N = 105 units of the four models G = 1, 2, 3). The typical mix of the shift schedule among the three models is: Nu = 50, N2 = 30 and N3 = 25. The Management feels it will be desirable to adopt mixed model make-to order assembly line with three features fand four options k as given in the table for the frequency of option, na below no fik 0 2 3 4 1 2 20 0 50 80 30 40 40 10 20 10 R fk If RA bh 1 h 1 2 3.0 3.1 4 5.0 5.1 5.2 53 5.4 6 7 8 9.0 9.1 92 10 1 1 1 2 2 2 2 2 1 1 4 1 1 1 1 Prepare the inventory requirement for each part over the shift schedule when N=105 for (1) When same part for all options of feature f (11) When different part for each option of feature f (b) (b) Suppose the inventory requirement for the above line is 105 for which the Rt = Rht=105 for t =1-7. On hand inventory =300; on-order inventory = 0 and the multiple quantity from supplier M for the parts are given as show below; determine the inventory replenishment worksheet for day 1 for the 10 parts 8 90 9.1 92 10 4 1 1 1 1 Prepare the inventory requirement for each part over the shift schedule when N-105 for (1) When same part for all options of feature (m) When different part for each option of feature (b) (b) Suppose the inventory requirement for the above line is 105 for which the RtRht=105 fort-1-7; On-hand inventory =300, on-order inventory = 0 and the multiple quantity from supplier . M for the parts are given as show below, determine the inventory replenishment worksheet for day 1 for the 10 parts 1 12 14 M 12 30 100 20 24 1 0 40 6 30 6 7 8 9 10