Question: Question (1): Solve this resource scheduling problem with the Parallel method. Develop a resource- constrained schedule in the loading chart that follows to see how

Question (1): Solve this resource scheduling

Question (1): Solve this resource scheduling problem with the Parallel method. Develop a resource- constrained schedule in the loading chart that follows to see how long the project will take with only 2 carpenters. B 2 E 2 G 2 NN D 2 2 2 F H 2 2 3 3 3 2 ID RES DUR ES LF SLO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 |A|2|2 B 21 C23 D2 1 E2 2 F 1 3 G2 2 H 2 2 Resources scheduled