Question: Question (4):(8 marks) Solve this resource scheduling problem with the Parallel method. Develop a resource- constrained schedule in the loading chart that follows to see

Question (4):(8 marks) Solve this resource

Question (4):(8 marks) Solve this resource scheduling problem with the Parallel method. Develop a resource- constrained schedule in the loading chart that follows to see how long the project will take with the maximum available number of resource per period is 3. 3 2 1 2 2 5 2 2 3 Legend ES ID EF SL RES SL 2 3 LS DUR LF ID RES DUR ES LF SLO 1 2 5 6 7 9 10 11 12 13 223 324 4 15 523 6 22 Resources scheduled Resources available 3 3 3333 3 3 3 33 3 3