Question: Solve this resource scheduling problem with the Parallel method. Develop a resource- constrained schedule in the loading chart that follows to see how long the

Solve this resource scheduling problem with the

Solve this resource scheduling problem with the Parallel method. Develop a resource- constrained schedule in the loading chart that follows to see how long the project will take with only 2 carpenter's. NNI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ID RES DUR ES LF SLO A 22 B 21 E 22 F 13 G 22 H 2 2 Resources scheduled