Question: QUESTION 1 Using the assembly-line balancing procedure, what is the required workstation cycle time if the production time in minutes per day is 480 and

QUESTION 1 Using the assembly-line balancing

QUESTION 1 Using the assembly-line balancing procedure, what is the required workstation cycle time if the production time in minutes per day is 480 and the required output per day in units is 500? (Use minute as unit. Keep two decimal points if applicable) QUESTION 2 Task Task Time (seconds) Tasks that must Precede 40 B 32 A C 35 D 30 E 35 B F 21 C G 10 E H 40 D,F,G The above tasks must be performed on an assembly line in the sequence and times specified. The workstation cycle time is 76 seconds. Using the longest task time to balance the assembly line, the first workstation include the second workstation include the third workstation include and the fourth workstation include (For each blank write tasks in alphabetical order without space or comma. For example, if workstation 1 includes task A, task C and task E, write them as ACE, not A,C,E, ACE or CAE.) 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!