Question: Question 54 2.5 pts Using a 3 sigma chart (both upper and lower controllimits) and the process described above, the last several process samples taken

Question 54 2.5 pts Using a 3 sigma chart (both
Question 54 2.5 pts Using a 3 sigma chart (both upper and lower controllimits) and the process described above, the last several process samples taken have had the following means: 6'1" 6.5'11" 6' 5'11" 6'1" 5'10" 5'11" 5'11" 5'11" 5'11" 5'11" 5'10" 5'11"5'11" Based upon just this information, you should: do nothing for now, still within the limits have studied the chapter more stop the process and investigate for an out of control condition. O adjust the process by 1" none of the above