Question: Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs for each project duration are:

Reducing Project Duration Crash cost (slope),
Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs for each project duration are: $550 (20 time units), $400 (19), $350 (18) $100 (17), and $50 (16). Activity Crash Cost (Slope) 251 MAL. Crash Time 1 Normal Normal Time Cost A 6 75 B C -No 4 A 0 70 90 100 80 100 D 5 3 6 20 65 G 1 3 E 1 F G 105 40 1 3 6 3 lo 140 80 90 2101 B 0 200 1 After crashing the project using the cost-duration graph method, determine the duration of the project associated with the optimum cost-time point 10

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!