Question: undefined Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs for each project duration

undefined Reducing Project Duration Crash costundefined

Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs for each project duration are: $550 (20 time units), $400 (19), $350 (18), $100 (17), and $50 (16). Activity Crash Cost (Slope) 25 75 Max. Crash Time 1 Normal Normal Time Cost F 6 70 90 B 2 4 0 0 5 100 D 20 1 3 80 D G E 65 3 6 100 F 1051 1 3 140 40 1 6 80 G H 0 0 3 90 B E H I 200 1 5 210 After crashing the project using the cost-duration graph method, determine the cost of the project associated with the optimum cost-time point. 1475 1295 1350 1430 1305 1520

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!