Question: Refer to Table 56.1. Factors for Computing Control Chart Limits (3 sigma) for this problem. Sampling 4 pieces of precision-out wire (to be used in

Refer to Table 56.1. Factors for Computing

Refer to Table 56.1. Factors for Computing Control Chart Limits (3 sigma) for this problem. Sampling 4 pieces of precision-out wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: R Hour 1 2 3 4 5 6 x 3.15" 3.00 3.32 3.29 3.07 2.76 R 0.76" 1.13 1.48 1.21 1.22 0.37 Hour 7 3.05' 8 2.55 9 3 .12 10 2.75 112.93 12 3.07 R 0.53" 1.08 0.76 1.28 1.22 0.40 Hour X 133.21" 14 2.73 15 3.02 16 2.74 172.76 18 2.84 R 0.90" 1.26 101 0.50 1.43 1.34 Hour X 19 4.51" 20 2 .89 21 2.75 22 3.18 23 2.94 24 2.54 1.61" 1.04 1.08 0.41 1.53 1.02 Based on the sampling done, the control limits for 3-sigmax chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCL) - inches (round your response to three decimal places). Lower Control Limit (LCL:) inches (round your response to three decimal places). Based on the x-chart, the wire cutting process has been The control limits for the 3-sigma R-chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCLR)- inches (round your response to three decimal places). Lower Control Limit (LCLR) - inches (round your response to three decimal places). Based on the R-chart, the wire cutting process has been Enter your answer in each of the answer boxes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!