Question: Refer to Table 56.1-Factor for Comesting Control Chart Linda mo this problem Samping peces el precision cost wire to be used in computer assembly every

Refer to Table 56.1-Factor for Comesting Control
Refer to Table 56.1-Factor for Comesting Control Chart Linda mo this problem Samping peces el precision cost wire to be used in computer assembly every hour for the past 24 hours has produced the following route R Mour 1 2 3 4 5 R 0.71 123 1.18 3.15 3.00 3.12 3.49 3.07 2.96 13 Hour 7 8 9 10 11 12 x 295 2.55 3.12 2.75 2.73 2.87 Hour 13 14 15 10 17 10 R 321" 0.90 283 131 3.22 1.11 2.94 0.50 2 1.45 2.64 Hour 19 20 21 22 23 24 331 2.70 255 3.28 R 1.66 104 108 0.41 1.83 0.00 131 1.22 0.42 1.58 1.17 0.40 2.64 Based on the samping done, the controllimit for me xwe round of intermediate intotdeal placed before proceeding with the collations Upper Control U(UGL.) - inches fround your reponse to the decimal place) Lower Control Uime (LC) - che round your love decimal Based on exchan, the wreating procesas been The control for the supe R chart we found at intermediate calculation to decimal place before proceeding with the collation Upcer Control Limit(UCL) -inches pound your response to three decimal place! Lover Control Limanches fround your reports reddin Based on the chart the wrecking process has been

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!