Question: Scanner Project You have been serving as Electroscan's project manager and are now well along in the project. Develop a narrative status report for the

Scanner Project You have been serving asScanner Project You have been serving as

Scanner Project You have been serving as Electroscan's project manager and are now well along in the project. Develop a narrative status report for the board of directors of the chain store that discusses the status of the project to date (see Table C13.3) and at completion. Be as specific as you can, using the numbers given and those you might develop. Remember, your audience is not familiar with the jargon used by project managers and computer software personnel; therefore, some explanation may be necessary. Your report will be evaluated on your detailed use of the data, your total perspective of the current status and future status of the project, and your recommended changes (if any). TABLE C13.3 Electroscan, Inc. 555 Acorn Street, Suite 5 Boston, Massachusetts 29 In-store Scanner Project (thousands of dollars) Actual Progress as of January 1 Name PV EV AC SV CV BAC EACE Scanner project 420 395 476 -25 -81 915 1103 88 20 30 260 20 30 10 40 92 20 30 10 2 0 30 0 195 20 45 25 20 30 6 2 0 0 30 0 150 20 55 30 25 75 20 16 5 5 1 0 0 0 5 0 -46 5 -21 72 15 25 5 2 0 25 0 196 15 76 45 31 105 40 25 40 0 148 15 35 -15 -6 130 H 1.0 Hardware H 1.1 Hardware specifications DS H12 Hardware design (DS) H 1.3 Hardware documentation (DOC) H 1.4 Prototypes (PD) H 1.5 Test prototypes (T) H 1.6 Order circuit boards (PD) H 17 Preproduction models (PD) OP 1.0 Operating system OP 1.1 Kernel specifications (DS) OP 1.2 Drivers OP 1.2.1 Disk drivers (DEV) OP 1.2.2 VO drivers (DEV) OP 1.3 Code software OP 1.3.1 Code software (0) OP 1.3.2 Document software (DOC) OP 1.3.3 Code Interfaces ( OP 1.3.4 Beta test software (T) U 1.0 Utilities U 1.1 Utilities specifications (DS) U 1.2 Routine utilities (DEV U 1.3 Complex utilities (DEV) U 14 Utilities documentation (DOC) U 1.5 Beta test utilities U S 1.0 System Integration S 1.1 Architecture decisions (DS S 1.2 Integration hard/soft (DEV) S 1.3 System hard/software test (O) S 1.4 Project documentation (DOC) S 1.5 Integration acceptance testing (U) -4 0 0 0 -4 0 0 0 0 0 -45 0 10 5 5 -55 -10 -15 -30 0 21 0 0 30 -9 0 3 0 5 0 30 45 213 15 25 8 40 30 25 100 431 15 97 60 37 336 200 42 96 30 274 15 35 150 20 40 153 8 75 20 12 30 30 -30 -20 5 -15 0 -40 5 55 0 87 20 30 100 330 20 70 40 30 240 100 50 60 30 200 20 20 100 20 40 125 10 50 20 15 30 20 -15 90 -30 25 0 108 20 20 60 8 0 49 9 9 30 0 10 0 30 17 0 0 46 9 25 0 12 0 8 8 0 60 7 45 0 8 0 0 0 -11 2 2. -15 0 2 0 -2 0

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!